System solutions for broad range of ships

Car Carrier / PCTC

LGM Engineering’s "High pressure/Low pressure LNG Fuel supply system" for PCTCs was put into operation in 2020. This was the world's first dual-fuel PCTC with gas supply system equipped with LGM storage tank BOG re-condensing unit (SBR) which significantly extend the holding time of the system.